Construction Management
Employer : Panchthar Power Company
Consultant : Sanima Hydro And Engineerig
Civil Contractor :High HimalayanHydroConstruction
Hydro-mechanical Contractor : Machhepuchhre HM
Electro-mechanical contractor : Asia Pacific
Transmission line contractor :Cosmic Engineering
Consortium bank : 11 Banks (Lead Bank: Sanima Bank Ltd)
Independent Bank Consultant :Hydro Consult Engineering Ltd
HKAHEP is a run of river project with design discharge of 8.12 m3/s.
Net Head : 217.5 m
Design Flood : 852m3/sec
Installed Capacity : 14.9MW
No. OF Unit : Two
Rated Output Of Each Unit : 7.750MW
Annual Average Energy : 84.76GWH
Turbine : Francis (vertical axis)
Rated Speed : 1350 rpm
Generator : Synchronous 3-phase
Rated output : 8775 KVA
Intake : Side Intake
Headrace Tunnel : 3975.32m+183.60 (Including Adit tunnel)
Power House : Surface type
Transmission Line : 132 KV single circuit (4.5KM)